02 — Risk
Monte Carlo
Monte Carlo turns deterministic durations into probabilistic ones. Define a distribution per activity, run 10,000 iterations, and see how often each activity ends up on the critical path. Use it for risk-adjusted committed dates and to identify which activities most affect total finish.
Preview
Run 10,000 iterations on activity durations. P50/P80 finish, criticality index, top risk drivers.
What's inside
- Triangular and PERT distributions on activity durations
- 10,000-iteration simulation with deterministic seeding
- P10 / P50 / P80 / P95 finish date distributions
- Criticality index per activity (% of runs on critical path)
- Top risk drivers ranked by sensitivity to total duration
- Tornado diagram and S-curve outputs
- Per-WBS risk profiles for scoping mitigation
- Re-run on any uploaded schedule revision without re-uploading
Other modules
01 — Analytics
XER analytics
Trend charts, schedule health scoring, float erosion, progress variance, and revision-to-revision deltas.
03 — Visualization
Gantt
Interactive Gantt with WBS hierarchy, baseline variance, date-window filters, and a paper-and-blueprint aesthetic.
04 — Planning
Summary schedule
Create presentation-ready summary schedules with slide/page modes, labels, title blocks, baseline overlays, milestones, and dependency arrows.