Summary schedule
Summary Schedule is a lightweight visual planning surface for executive and owner-facing schedule exhibits. Build a clean timeline from scratch, drag task bars across phase lanes, resize durations, place milestones, connect logic ties, color-code risk, and print the result as a polished schedule graphic.
Preview
Create presentation-ready summary schedules with slide/page modes, labels, title blocks, baseline overlays, milestones, and dependency arrows.
What's inside
- Timeline canvas with year, quarter, month, and week lane controls
- Drag-and-drop task bars across phase and workstream lanes
- Resizable durations with start and finish dates recalculated live
- Milestone diamonds for permit, dry-in, turnover, and contract dates
- Finish-start, start-start, finish-finish, and start-finish relationships
- Multi-select alignment, distribution, group bands, and batch formatting
- Title block, footer, style kits, and presentation page modes
- Direct draft-from-project-XER flow inside the project workspace
- Editable PowerPoint shapes plus PNG, SVG, PDF, CSV, and JSON exports
Other modules
XER analytics
Trend charts, schedule health scoring, float erosion, progress variance, and revision-to-revision deltas.
Monte Carlo
Run 10,000 iterations on activity durations. P50/P80 finish, criticality index, top risk drivers.
Gantt
Interactive Gantt with WBS hierarchy, baseline variance, date-window filters, and a paper-and-blueprint aesthetic.